Construction of Roads from Tawaian to Dibba

Fujairah - UAE

Client: Ministry of Public Works
Consultant: Halcrow
 

The highway linking Tawaian to Dibba is about 30 kilometers long. Thirty slopes along the highway require slope stabilization improvements.

Description of work:
• Excavation and clearance of debris
• Installation of rock bolts, rock dowels, wire mesh and shot Crete
• Construction of concrete buttresses and barriers at slope toe
• Installation of raking drains
• Temporary traffic management and temporary road diversions
• Reinstatement of road pavement, ditches and road facilities