"Ski Village - Concrete Works: Retaining Walls, Ski Legs Abutments, and Zone P Plaza"
The project consisted of the implementation of sustainability and environmental requirements.
The scope of works included:
> Construction of retaining walls up to 29 m height stabilized with rock anchors.
> Construction of piers and abutments up to 15 m height.
> Installation of rock anchors and construction of frontal walls up to 15 m height.
> Pouring of building foundations involving 40,000 m3 of concrete.
> Construction of plaza building with coffer slab finishing.
> Construction of steel structure abutment walls up to 15 m height, including installation of bearings and anchor bolts.
> Construction of gabion walls and MSE walls.
> Excavation and backfilling works.
> Backfilling using geofoam material with a quantity of 200,000
m3.
> Slope stabilization using shotcrete, wire mesh, and
rockfall barriers.
Total concrete quantity: 150,000 m3.
The project consisted of the implementation of sustainability and environmental requirements.
The scope of works included:
> Construction of retaining walls up to 29 m height stabilized with rock anchors.
> Construction of piers and abutments up to 15 m height.
> Installation of rock anchors and construction of frontal walls up to 15 m height.
> Pouring of building foundations involving 40,000 m3 of concrete.
> Construction of plaza building with coffer slab finishing.
> Construction of steel structure abutment walls up to 15 m height, including installation of bearings and anchor bolts.
> Construction of gabion walls and MSE walls.
> Excavation and backfilling works.
> Backfilling using geofoam material with a quantity of 200,000
m3.
> Slope stabilization using shotcrete, wire mesh, and
rockfall barriers.
Total concrete quantity: 150,000 m3.