Construction of Wadi Adai Interchange
Construction of Wadi Adai Interchange
Construction of Wadi Adai Interchange
Construction of Wadi Adai Interchange
Construction of Wadi Adai Interchange
Construction of Wadi Adai Interchange
Construction of Wadi Adai Interchange
Construction of Wadi Adai Interchange
Construction of Wadi Adai Interchange
Construction of Wadi Adai Interchange
Construction of Wadi Adai Interchange
Construction of Wadi Adai Interchange
Construction of Wadi Adai Interchange

Construction of Wadi Adai Interchange

Muscat - Oman

Client: Muscat Municipality
Consultant: Parsons International & Company LLC
The construction of Wadi Adai interchange incorporates the establishment of a third level “trumpet” arrangement that will facilitate left-turns. The interchange will be located in an urban zone with very heavy traffic.

Description of Work:
• Construction of steel gantry structure to support bridge deck formwork without interruption of traffic
• Construction of Bridge No 2: (343 meters and 226 meters long) post-tensioned concrete two-cell box girder bridge with pile foundations
• Road works including water drainage, asphalting, road lighting, safety barriers, paving and curbing, road signing and marking
• Signalized at-grade intersection
• Public utility service diversion and protection
All Projects >>