Sanliurfa-Turkey

Client: Sanliurfa Metropolitan Municipality
"Construction of Sanliurfa Viransehir-Ceylanpinar Integrated Solid Waste Management Project"

Construction Site for New Landfill Site
The works contract consists of complete engineering design and construction, civil, infrastructural, mechanical and electrical works, commissioning, operational training of the Employer’s personnel and hand-over to the Employer of the following facilities ready for operation:
> Viransehir-Ceylanpinar Sanitary Landfill.
> Auxiliary Buildings and Structures (weighbridge, wheel washing unit, water reservoir, fuel tank, etc.) and buildings (security guardhouse building, weighbridge building, administration building, maintenance building and transformer & emergency generator building, etc.) in line with regulatory standards required for a Class-II Sanitary Landfill.
> Leachate Collection System and Leachate Treatment Plant on the Sanitary Landfill.
> A Composting Plant.
> A Mechanical Sorting Plant.
> Gas Collection System and Flare.
> All infrastructure.
> Landscaping work at new landfill, as well as other facilities under the scope of works.
Construction Site for Viransehir Transfer Station:
The works contract consists of complete engineering design and construction, civil, mechanical and electrical works, commissioning, operational training of the Employer’s personnel and hand-over to the Employer of the following facilities ready for operation:
> Transfer Station, with all structures, buildings and infrastructure, required for proper operation,
> Landscaping works.
Construction Site for Ceylanpinar Dump Site
The works contract consists of complete engineering design and construction, civil, mechanical and electrical works, commissioning, operational training of the Employer’s personnel and hand-over to the Employer of the following facilities ready for operation:
> Closure and rehabilitation of the dump site, together with all components,
> Landscaping work.